VICTORIA HOTEL EXTENSION


This project involved a new three storey extension to a four star hotel which included 30 rooms, a gymnasium and skywalk.

GeoSolve provided a comprehensive geotechnical, investigation, analysis, and foundation design service for the project.

After evaluating a range of potential options, we designed a jet grout/micropile design and collaborated with specialist contractors to verify installed pile capacities in challenging ground conditions. This approach resulted in a robust foundation at less cost than more convention piling techniques.

Key Project Challenges

  • Variable soft and potentially liquefiable soil

  • Minimal working room with adjacent structures

Victoria Hotel piling.jpeg

Colin Macdiarmid - Geotechnical Team LeaderMEng, CPEng (UK &NZ), CMEngNZ, MICE

Colin Macdiarmid - Geotechnical Team Leader

MEng, CPEng (UK &NZ), CMEngNZ, MICE

Rob Stuff - Engineering GeologistBSc (Geology), PGDip (Engineering Geology), MEngNZ, MAIG

Rob Stuff - Engineering Geologist

BSc (Geology), PGDip (Engineering Geology), MEngNZ, MAIG

Stuart Minty - Geotechnical EngineerNZDE (Civil), MEngNZ

Stuart Minty - Geotechnical Engineer

NZDE (Civil), MEngNZ